How to Defend a Product Specification Against Substitution

How to Defend a Product Specification Against Substitution

You defend a specification by making equivalence measurable and by staying involved after the contract is awarded. In practice that means four things: the performance criteria the building actually needs, and which your product can prove, are written into the tender, the evidence for those criteria is ready before anyone asks, your team knows which contractor won and who buys for them, and you have a factual response prepared for the moment an alternative is proposed. On public projects you cannot stop equivalent products from competing. You can make sure "equivalent" is judged on the criteria that matter for the building.

This guide is for specification and project sales teams at building product manufacturers who win the specification during design and then lose the order during procurement.

Why specified products get replaced

A specification is a decision made during design. The order is placed months later by someone else, for example the contractor's buyer, under different pressures. Possible reasons for a substitution request include price, delivery times, a contractor's existing supplier agreements, installer familiarity with another system, or a value engineering round in which the client asks for savings.

None of these reasons is illegitimate. So do not argue against substitution in general. Show, for this project, whether the alternative delivers the same result and whether the saving remains once installation, interfaces and warranty are included.

What the rules allow on public projects

Under Article 42 (4) of EU Directive 2014/24/EU, technical specifications may refer to a specific make or type only in exceptional cases and only with the words "or equivalent". A separate rule in Article 42 (5) covers references to standards and other technical specifications: a contracting authority must not reject a tender because it deviates from a referenced standard if the tenderer proves that its solution meets the requirements in an equivalent way. In Germany, § 7 (2) VOB/A applies the brand rule to public works below the EU thresholds, and § 7 EU (2) VOB/A in the 2026 edition applies it above them, in force since 8 September 2026 according to the BMWSB introduction decree.

A guidance note on product-neutral tendering published by Bremen's Senator for Economic Affairs, Ports and Transformation (dated 30 July 2026) draws the practical conclusion. If a reference product is named, the contracting authority has to state the functional requirements against which an alternative will be judged as equivalent. A note that the listed values are only guide values is not enough, because bidders cannot tell how far they may deviate.

Manufacturers can work with this. Equivalence is judged against the criteria in the tender. If those criteria are vague, almost anything is equivalent. If they are precise and relevant, the comparison becomes a technical question with a clear answer. The criteria have to come from what the building needs. The Bremen guidance treats requirements that only one product meets without a functional reason as a hidden breach of product neutrality.

Private projects work differently

Private clients are generally not bound by procurement law, but there are exceptions. In Germany, private-law companies can be contracting authorities under § 99 no. 2 GWB if they are set up to meet needs in the general interest and are mainly publicly financed or controlled, and § 99 no. 4 GWB covers certain projects, such as hospitals or school, university and administrative buildings, that are more than 50 percent publicly subsidised. The EU basis for the subsidy rule is Article 13 of Directive 2014/24/EU. Where no procurement law applies, the construction contract and the client's own process decide whether a contractor may propose an alternative and who has to approve it. Depending on the contract, the architect or the client's project manager reviews the request.

That person is a central contact after award. If they understand why the specified product was chosen, they can ask the right questions when an alternative arrives. If the tender documents only contain a product name, they have no yardstick for the comparison.

A six-step playbook

  1. Name the decisive criteria during design. Agree with the planner which two or three properties actually drive the choice for this building, for example fire classification, acoustic performance, load capacity or a certified system build-up. Everything else is secondary.

  2. Get those criteria into the tender text. Each criterion needs a value and a test standard. A product name with "or equivalent" gives no yardstick if the description around it is generic. A separate guide in this series covers how to write specification texts that architects use.

  3. Prepare the evidence before it is requested. Declarations of performance, test reports, system approvals and installation instructions should be in one place and current. When an alternative is proposed, one of the first questions is whether it has comparable proof.

  4. Track the project from award to purchase. Know which contractor won, who their buyer is and when the package will be ordered. If nobody follows the specification between tender and order, your team may only hear about a substitution request once it has been decided.

  5. Prepare a substitution response. A one-page comparison against the criteria in the tender, plus the costs that a unit price comparison misses: installation time, accessories, interfaces to other trades, maintenance and warranty conditions.

  6. Bring facts to the approver, not complaints. Send the comparison to the architect or project manager who has to approve the change. Keep it neutral. A comparison against the criteria is easier for the approver to check than a complaint.

Matching arguments to evidence

Substitution argument

What to compare

Evidence to have ready

"The alternative is cheaper"

Total installed cost, not unit price

Installation time, accessories, interface work, maintenance

"It has the same values"

Same test standard and the same system build-up

Test reports for the tested system build-up as well as for the product

"Delivery is faster"

Real lead time for this project's quantities

Confirmed delivery date in writing

"Our installers know the other system"

Warranty and certified installation requirements

Installer training offer, warranty conditions

"The client asked for savings"

Which savings affect performance or approvals

Alternatives within your own range, if any

What to avoid

Do not claim that an alternative is not equivalent unless you can show it against the tender criteria. Do not criticise a competitor's product in writing to a planner or client. Both damage your credibility with the person whose approval you need. If your product genuinely offers no advantage for this project's criteria, a cheaper alternative from your own range may keep the order with you.

Measure where you lose specifications

Record for every specified project whether the order went to your product, to an alternative or to a competitor, and at which point the change happened. After a few quarters, patterns can appear: certain product groups, certain contractors or certain project types where specifications rarely survive. That is where the playbook above pays off first. Our article on specification rate explains how to calculate the share of specifications that convert into orders.

How Building Radar fits in

Building Radar tracks construction projects from early planning to tender, and Jeane, the intelligence inside Building Radar, summarises tender documents and flags deals that stall or are at risk. For a specification team, that makes it easier to see when a specified project goes to tender. Who wins the contract and when the package is ordered is something your team still follows up in step four. See how this works on our tenders page.

Frequently asked questions

Can a manufacturer prevent "or equivalent" alternatives on public projects? As a rule, no. When a reference product is named, EU and German procurement rules require that equivalent products can compete. The Bremen guidance describes a narrow exception where a product-specific reason justifies naming one product only. A manufacturer can help make sure the tender states clear functional criteria, so equivalence is assessed on properties that matter for the building.

Who decides whether a substitute product is accepted? On public projects, the contracting authority assesses equivalence against the criteria in the tender. On private projects without procurement obligations, the construction contract decides, and approval sits with the architect or the client's project manager, depending on the contract.

What evidence is most useful against a substitution request? Test reports for the exact system build-up, declarations of performance, approvals and a comparison of total installed cost. Evidence that refers to the criteria in the tender carries more weight than general product claims.

When should the specification team hand over to sales? At award at the latest. Someone has to own the relationship with the winning contractor's buyer before the package is ordered, because the order decides which product is delivered.

Exclusive project sales insights, directly to your inbox

Subscribe to our weekly newsletter.

For more information on how we handle your data, see our Privacy Policy.

Talk to us about your specification-to-order process

If you want to discuss how to follow specified projects from tender to order, you can schedule an initial consultation.