Since 8 September 2026, German public contracting authorities have had to apply the revised sections 2 and 3 of the VOB/A to works contracts above the EU thresholds, according to the introduction decree of the Federal Building Ministry (BMWSB) of 14 October 2026. Four changes reach building product manufacturers through their contractor customers. Authorities must now state whether they allow variant bids. Suitability is first shown through self-declarations. The lot principle has moved into a new § 5a EU, with an added exception for large infrastructure projects. And a new § 8c EU sets energy-efficiency requirements for energy-related products. Below the EU thresholds, section 1 of the VOB/A in its 2019 edition continues to apply.
This article is for sales and specification teams at manufacturers who supply German public building projects. It covers the changes that affect how your products get into a tender or an offer. It is not legal advice, and the research cutoff is 11 November 2026.
Where the changes come from
The trigger was the German act to accelerate public procurement (Gesetz zur Beschleunigung der Vergabe öffentlicher Aufträge), published in the Federal Law Gazette on 18 May 2026 and in force since 1 July 2026. It changed the GWB, the VgV and the VSVgV. The VOB/A sections 2 and 3 had to follow so that the rules for works and for supplies and services stay aligned. The German committee for construction contract procedures (DVA) published the revised text in the Federal Gazette on 24 August 2026 (BAnz AT 24.08.2026 B6). It became binding once the references in § 2 VgV were updated on 8 September 2026.
Section 2 applies to public works contracts above the EU thresholds. Section 3 covers defence and security. Section 2 is the one that covers public building projects outside defence.
The changes at a glance
Rule | What changed | What it means for manufacturers |
|---|---|---|
§ 8 EU (2) No. 3, variant bids | The authority states in the contract notice whether it allows, requires or excludes variant bids. If the notice says nothing, variant bids are not allowed. | A variant built around your product is only possible where the notice allows it. Check this first. |
§ 6b EU, self-declarations | Suitability is shown first through self-declarations. Further documents are requested later and only from bidders with a realistic chance. | Mainly affects your contractor customers. Product evidence requested with the offer is a separate question. |
§ 5a EU and § 97a GWB, lots | The lot principle moved to § 5a EU. Combined award remains possible for economic or technical reasons, and now also for time reasons on certain large infrastructure projects. | On those projects, one main contractor may buy for several trades. |
§ 8c EU, energy-related products | New rule, largely matching the new § 67 VgV. For products with an EU energy label, authorities generally require at least the lower of the two highest classes in which a significant number of products is available. | Relevant for manufacturers of labelled products, for example in building services. Know your class per product. |
The decree lists these as main changes and says the list is not exhaustive. Read the full revised text before relying on any provision.
Variant bids must now be declared
For manufacturers, this change has a direct effect on sales. In the 2026 text, § 8 EU (2) No. 3 says that the authority indicates in the contract notice whether it allows, requires or excludes variant bids (Nebenangebote), without having to give reasons. Where the notice is silent, no variants are allowed. This matches Article 45 of Directive 2014/24/EU, which also says variants are not authorised without such an indication.
Where variants are allowed, the authority sets minimum requirements, and the award criteria must work for main bids and variants alike. Price may be the only award criterion.
In practice, check the notice before your team spends time on an alternative proposal for a contractor. If variants are excluded or not mentioned, a bidder can offer a deviation from the technical specifications within the main bid, where the conditions of § 13 EU (2) are met. Our article on variant bids and equivalent products in this series explains both routes.
Below the EU thresholds the logic is different. Under § 8 (2) No. 3 VOB/A, section 1, the authority has to state if it does not allow variant bids.
Self-declarations first
Under the new § 6b EU, contracting authorities should first accept self-declarations as evidence of suitability and ask for further documents later in the procedure, and only from bidders who are in contention (BMWSB decree). This concerns the bidding company, not the products it offers.
For a manufacturer, the practical point is timing. If your contractor customer reaches the later stage, product documents may be requested at short notice. Keep declarations of performance, test reports and approvals ready to send the same day.
Exclusive project sales insights, directly to your inbox
Subscribe to our weekly newsletter.
Lots: same principle, one new exception
The lot principle now sits in § 97a GWB and, for works, in § 5a EU. Work is split into lots by quantity and by trade. Several lots may be awarded together where economic or technical reasons require it. New since 1 July 2026: lots may also be combined for time reasons on infrastructure projects whose estimated value reaches at least twice the EU threshold, if the project is financed from the special fund for infrastructure and climate neutrality or is transport infrastructure such as federal roads or railways.
For building product manufacturers, this exception is relevant on infrastructure projects with buildings attached, for example stations or airport buildings. Where it is used, product decisions can move from separate trade contractors to one main contractor. Our article on who chooses building products under each contract model describes what that means for timing.
Energy-efficiency requirements for energy-related products
§ 8c EU has been revised. According to the BMWSB decree, for products covered by the EU energy labelling framework (Regulation (EU) 2017/1369), authorities now require at least the lower of the two highest energy-efficiency classes in which a significant number of products is available. For a combined installation, a lower class can be accepted if the installation as a whole reaches the highest class available for its type. A separate paragraph covers products without an energy label that are subject to ecodesign requirements.
If you sell labelled products into public buildings, keep the current class per product in your tender texts and datasheets, so a planner can check it without asking.
Specifications and equivalence in the 2026 edition
On product-neutral specifications, § 7 EU (2) covers two cases above the thresholds. Under sentence 1, technical specifications may not refer to trade marks, patents, types, a specific production or origin where this favours or excludes certain companies or products, unless the subject matter of the contract justifies it. Under sentence 2, such references are permitted by way of exception where the subject matter cannot be described precisely and intelligibly enough. Sentence 2 requires these references to carry the words "oder gleichwertig" (or equivalent). Where a performance deviates from the technical specifications under § 7a EU (1) No. 1, § 13 EU (2) allows it to be offered if it is equivalent to the required level of protection with regard to safety, health and fitness for use. Equivalence must be proven with the bid. Section 1 of the VOB/A, which covers public works below the thresholds where federal or state rules apply it, remains in its 2019 edition.
A checklist for sales teams
Read the contract notice for the statement on variant bids before preparing any alternative.
Keep product evidence ready for short-notice requests at the later stage of a procedure.
On large infrastructure projects, check whether lots are combined and who will buy your trade.
For energy-labelled products, keep the class per product visible in tender texts and datasheets.
Brief your team on the wording of § 7 EU (2) and § 13 EU (2) in the 2026 edition.
How Building Radar fits in
Building Radar tracks construction projects from early planning to tender. When a tender is published, Jeane, the intelligence inside Building Radar, summarises the tender documents. Whether a notice allows variant bids is a point your team still checks in the notice itself. See our tenders page.
Frequently asked questions
Does VOB/A 2026 apply to private projects? In general, no. It applies to public contracting authorities above the EU thresholds. Some private bodies count as contracting authorities, for example certain subsidised projects under § 99 GWB.
Are variant bids now banned? No. The authority decides. Above the thresholds, it has to state whether it allows, requires or excludes them. Without that statement, they are not allowed.
What applies below the EU thresholds? Section 1 of the VOB/A in its 2019 edition, where federal or state rules require it. Under section 1, variant bids are allowed unless the authority excludes them.
What applies to brand references in the 2026 edition? § 7 EU (2) distinguishes two cases. References that favour or exclude certain companies or products are not permitted unless the subject matter of the contract justifies them. They are permitted by way of exception where the subject matter cannot be described precisely and intelligibly enough, and then with the words "oder gleichwertig". We have not checked for this article whether the wording differs from 2019.